We love collaborating and Fabricating, we aim to think outside the box and connect with the customer by creating tailored solutions.

 
 

SLA high resolution 3D printing

Form 1+ 125 X 125X 165 mm build volume

Form 2 145 X 145 X 175 mm build volume

FDM low-to medium resolution 3D printing

2X AnetA6 3D printers 220 X 220 X 230 mm build volume

Plasma CNC Cutting

Plasma cnc cutter, we can cut material sheet 2-12 mm thickness in different materials like mild steel. stainless(inox), aluminium (no lithium/aluminium alloys)

Laser cutting and engraving

Laser cutting medium 500 X 700

Laser cutting large 2440 X 1220,

CNC Milling strategy's  (3D,2,5D)

CNC 1220 X 3050 X 100 mm



How to Quote

Tell us what you want to get fabricated describe a little bit what it’s for, what material u plan to use, if you already have files to work with great also send them! The sooner we have a picture of the project and have files to work with, the faster we can give you a quote We will try to get in touch with you A.S.A.P ! normally with in the hour!

Lead time for 3D printing 1-2 Day’s

SLA - Supported file types .STL .OBJ

3D files in before 12:00 is printing same day - Next day shipping ( only smal parts for medium and large orders get in contact )

FDM - Supported file type .STL

3D files in before 12:00 is printing same day -Next day shipping (only smal and medium order except large parts/orders) contact if you need more info and leed time on your specific part contact via’ Get a quote 3D Printing

Robot facility enquire

below you can see the setup for the robot Stack (software-hardware pipeline) we have setup for our industrial ABB robotic arm. We have roughly 3 ways of generating Robot programs.

  1. Live robot programming with teach pendant

  2. Freeform movement offline programming with RoboDK software

  3. Additive/subtractive manufacturing derived from cad we follow tool paths via cam startegy’s




Software pipeline 

  • autodesk fusion360  cad/cam generation 

  • Robodk robot station environment offline programming

Hardware pipeline 

  • ABB irb-6400R200-2,8m

  • S4c+ controller + teach pendant + ethernet communication 

  • No end effectors installed yet (it will soon be upgraded with a 3 kw air cooled spindel)

  • Raspi interface for data drip feed to robot computer for large file handling (in progress)


Need more info and leed time on your specific project contact via’ Get a quote ROBOT

Leed Time Plasma cutting 3-5 Day’s

plasma cutting 2,5D - Supported file types DXF, AI,

Files in for 12:00 is cutting the next day (off course all depends on size and availability of the chosen material/order) if you need more info and leed time on your specific project contact via’ Get a quote Plasma

Leed Time for Laser cutting 3-5 Day’s

laser cutting 2,5D - Supported file types DXF, AI,

Files in for 12:00 is cutting the next day (off course all depends on size and availability of the chosen material/order) if you need more info and leed time on your specific project contact via’ Get a quote Laser

Lead Time for CNC 2-3 Day’s

CNC 2,5D - Supported file types DXF, AI,

Files in for 12:00 is milling next day (off course all depends on size and availability of the chosen material/order) if you need more info and leed time on your specific project contact via’ Get a quote CNC

For all other questions Get a Quote….